After building your study with all of the steps outlined here, it's ready to be moved live for sites to access. 

In many clinical studies, sites need local IRB approval before they can enroll patients. After following the steps below, sites can be individually activated/deactivated using the Site Manager.


This article will walk through every step of deploying a study for data collection.

If the study is NOT using Version Control, skip right to step 3 below.


1. Publish the study version

2. Include the needed sites in that version of the study

3. Change the study status to Live


Your study status can be controlled at any time to freeze or close a study. Read more about that here.